Critical Infrastructure

OK, not exactly, but I finally constructed a throne of brick for our grant-fountain. Behold:

There will be access doors in the two openings, and all of the ‘works’ need to be installed before final enclosure and trimming. While not exactly a linchpin of the project, getting this done meant clearing the significant amount of floor space taken up by the grant mounted awkwardly cross-ways on a pallet.

Also, though less aesthetically interesting, there is a bunch of actual critical infrastructure on the roof now, including HVAC units, exhaust fans, glycol chiller, etc, and we’re furiously scrambling around trying to get it all assembled. And figure out when we can finish the brewery floor. And wall. And etc etc etc.